Wednesday, April 15, 2009

Carlisle Rehearsal








The Carlisle High School gym was constructed below ground level which makes moving equipment into it a bit of a challenge.  Pit warm-up took place upstairs (ground level) while the battery warmed up on the floor.  Once warm ups were complete it was time to move all of the equipment down to the gym floor level for full rehearsal.

And there's no elevator.

Jeff had the great idea of using the cart from the performance floor upside down as a sled for the mixer.  It worked great!

2 comments:

  1. Wow! ALissa told me about this from the last time she was in Dayton! I couldn't imagine it. Great pictures!

    ReplyDelete
  2. What a great Blue Crew Beyer has.

    ReplyDelete